1. Carefully remove the main tube and control box component from the shipping case.
2. Place it on a stable surface.
3. Remove the shipping spacers from the drop cap by gently pulling up on the T-handle and extracting them.
Place them in your storage box, as they will be required if you need to ship the device in the future.
4. Next, pick up the device and push, then pull, on the T-handle to dislodge the bottom shipping spacer.
Retain this for future use as well.
5. Place the locking pin through the Drop Cap through the T-handle to prevent the handle from unintended movement.
6. Remove the base plate assembly from the Pelican case and place the device on top of it.
7. Align the holes in the tube component with the holes in the base plate assembly.
8. Use the included thumb screws to attach the tube to the base plate assembly. Be sure to check all screws after initial assembly, as additional tightening may be required.
9. To prepare for testing, charge the STRIKE by plugging the charging cable into the USB port located on the base of the control box.
For any assembly questions, please submit a support request or email a STRIKE representative at strike@biocorellc.com.